Dear United States Army Corps of Engineers

Our Plea

We ask you, the United States Army Corps of Engineers, to make the moral and ethical decision to question all of Graphite One’s proposals and information—not only in terms of how much money they can make or whether they can break even, but also in terms of how the company and the government can guarantee the continued viability of future food resources for the Inupiaq people living along the Bering Sea-to-Imuruk Basin Waterway.

Who We Are

My name is Keith Conger. I came to Alaska as a public-school teacher 42 years ago. My wife, Annie, is a member of the Native Village of Brevig Mission. She once served as its president. Annie recently retired after teaching in this region for 32 years. I retired a few years earlier. We now live in Nome.

I am the one pressing the keys for this comment letter because Annie’s eyesight has deteriorated to the point where she cannot read. But we are working on this together. We are contracted consultants by Brevig Mission’s tri-org (tribe, city, and Native corporation), but this letter comes from us as private citizens and a tribal member.

We are writing this comment letter regarding the Inupiaq people of the Bering Sea-to-Imuruk Basin Waterway, whose permanent residents include the tribes of Mary’s Igloo, Teller, and Brevig Mission. They subsist off this area, which is true wilderness and one of the few unspoiled natural places left on planet Earth.

We also acknowledge that other tribes in the region are affected by the proposed digging of a 1.1-mile-long, 1,340-foot-deep pit and all associated infrastructure requested by the Canadian company Graphite One.

The company is downplaying the effects this project will have on the tribe’s traditional hunting and fishing grounds. Their proposed operation would place toxins in the tribe’s environment that will last forever. These forever toxins will affect their future food security.

A Remote and Inhospitable Place for an Industrial Mine

We are writing this comment letter after a series of storms has pounded western Alaska for well over a week. The torrential rain, high winds, and flooding we have experienced are not unusual. One entire village had to be evacuated. We’ve had a series of storms throughout the 2026 ice-free season.

While some people believe the current political rhetoric, Arctic temperatures have been rising. When I landed in Brevig Mission in 1984, the Brevig Lagoon froze every year by October 1. The winter ice was thicker and stayed longer. Right now, a few days before Halloween, there is no evidence of ice on Brevig Lagoon. Another change over the last half century is that storms have increased in number and are more intense.

Water is the primary agent responsible for the damage storms cause. As a professional whitewater canoe and kayak instructor, I operate under a simple guideline:

“Water goes where it is told to go. If you work with it, you will be safe; if you work against it, you will not.”

Gravity is the main force telling water where to go. Gravity can pull water into depressions (puddles, ponds, etc.), but when gravity pulls water down an incline, it clearly demonstrates Newton’s Laws of Motion. It travels in a straight line and eventually collides with something else. Each water molecule damages the objects it collides with. An example of this in nature is the constantly shifting streams of an alluvial plain. Another is the formation of an oxbow in a river.

Man has always sought to harness and engineer nature. Still, it’s one thing when men create backyard swimming pools; it’s something entirely different when they try to alter the natural flow of melting snow or heavy rains falling down a steep mountainside, especially when it involves rerouting 12,440 feet (2 and ¼ miles) of naturally occurring alpine streams, which turn into torrents each spring.

Graphite One proposes alterations in the form of ditches on a steep mountainside in the remotest part of the Kigluaik Mountains.

But water follows the laws of motion, so these artificial structures will eventually fail. It is not an IF, but a when. The mining company may think they can counteract the laws of motion, gravity, and physics on this steep terrain, but their engineered alterations will eventually falter.

We hope that the engineers responsible for scrutinizing this permit don’t ignore this.

Forever Toxic

The pit the company proposes to dig will be forever filled with the mine’s waste materials. They will never go away. Water running into them and over them will be a bad thing. The company acknowledges this.

Any tainted water, whether through structural failures, seepage, or chemical spills, ends up in the waters that have sustained the people of the Bering Sea-to-Imuruk Basin for thousands of years.

If, by some miracle, the ditches are maintained for the proposed 20-year mine life, the question becomes: Who will care for them until the end of time?

Because that is what will be necessary. We’ve seen no clear plans about how this situation will be tended after the mine life. That’s because no true plan can guarantee ditch maintenance in perpetuity.

Will the federal government or the State of Alaska guarantee this by paying for it? The answer is NO; otherwise, the governments would be putting up the bonds, and not the company.

And that brings up another question. What is stopping the company, or any future company, from extending the 1.1-mile-long pit to a 2.5-mile-long pit or one that is 5 or 10 miles long? The company’s documents do not state that they won’t go further.

If the government endorses and permits a 1.1-mile-long crater, it is endorsing a 10-mile-long crater. And then the people of the Bering Sea-to-Imuruk Basin Waterway won’t just be directly affected by operational disturbance for 20 years; they will be affected for 100 years, or more.

Research shows that the bonding processes often don’t provide sufficient funding. The act of bonding doesn’t guarantee sufficient bonding! It typically covers a few years after “reclamation” (more on reclamation later).

No one can estimate, and then inflation-proof, any amount of money set aside for maintenance that would be necessary forever. And that is what permitting will allow: a 1.1-mile-long, 1,340-foot-deep waste-material-filled hole and its associated structures, which will need maintenance forever.

The same concerns apply to the tailings dam and the man-made clay or synthetic liner for their proposed 1,340-foot-deep hole in the ground. And how about the waste rock lake? These, too, will all fail in time.

Current Toxic Sites

According to ACAT’s (Alaska Community Action on Toxins) geographic data-driven maps, over 2,000 toxic and hazardous waste sites in Alaska exist due to military sites and extractive industries.

This project, by design, would eventually add to that list, since the company plans to process their desired substance on site and leave their waste material behind.

People in the Bering Sea-to-Imuruk Basin can look out their windows and see a clear example of this. US Government occupation of Point Spencer, which defines the outer edge of the Bering Sea-to-Imuruk Basin Waterway, began during World War II. It continued in 1961 with the establishment of a Coast Guard LORAN station.

In the summer of 2025, people were there filling enormous, white tainted-soil bags. The cleanup operation was conducted in secrecy.

Other toxic sites left by outside influences remain. One recently examined by the Environmental Protection Agency lies approximately 3 miles from the village of Teller and 6 miles from the village of Brevig Mission. There lies a toxic mound of lead, arsenic, and Benzopyrene.

Another toxic site lies at Davidson’s Landing, near the village site of Mary’s Igloo.

Can’t Control Nature

Rising temperatures and shifting weather patterns have caused major changes in the permafrost. This is not conjecture, but fact. The changes I’ve seen in the past 42 years were not predicted. And there is no way the government can accurately predict the degree of permafrost degradation that will occur in the next half century.

But permafrost degradation won’t be reversed.

The second force telling water where to go is meteorological. Winds create waves and set them in motion. Low-pressure systems bring high water, and rain adds to flooding.

The rushed, compressed time frame of these permitting processes increases the likelihood of system failures due to weather at this proposed graphite mine.

There has been little or no regional, noncompany-controlled, regulatory watchdog activity in the past ten years, and there is no indication that any will occur in the future.

The lack of past, current, and foreseeable future oversight allows mine operators to miss, or even hide, system failures and the trampling of ancient cultural sites.

Insufficient Computer Simulations

It sounds like, before the recent court orders at the Donlin mine, dam failures were not considered or were considered inadequately. But even though the court-ordered simulations are a good thing, they considered only 27% failure scenarios.

I’m afraid that the Imuruk Basin graphite mine will get even less consideration.

We are calling for computer simulations for all infrastructure that include 1–100% failure scenarios for all surrounding areas of the Imuruk Basin.

The Bering Sea-to-Imuruk Basin Waterway is affected by storms during the unfrozen months (May into November). Tuksuk Channel runs north/south. Flooding ocean waters from summer storms are forced into the basin from north to south.

Those north/south currents meet south winds, causing the waves to stack up to two or more times their height. Those towering waves slam into the walls of Ptarmigan Point, creating chaotic clapotis waves.

This is just one of many situations where barges will experience trouble that can lead to fuel spills.

One of the most important computer simulations would be the failure of the proposed 850,000-gallon, on-site fuel tank spilling its entire contents into the Imuruk Basin.

Computer simulations would show the effects of a spill during a multi-day flood event from both an ocean surge and heavy rain. Data for a 100% catastrophe scenario should be used that far exceeds Typhoon Merbok, which slammed the waterway in 2022, or Typhoon Halong, which hammered the west coast of Alaska in 2025.

Any failure of fuel containment facilities during these storms would push fuel-contaminated water well into the extensive wetlands on all sides of the basin, especially around the Agiapuk, Kuzitrin, Canyon, Cobblestone, Bluestone, and Pilgrim Rivers.

It would line the shores on Native fish camps and Native allotments. The affected acreage would be significantly higher than the formulas the federal government is using. Computer simulations would prove this.

Again, computer simulations for all possible catastrophic infrastructure failures and storm conditions must be conducted. And those conducting the simulations must be neutral third parties.

That brings up a good point. The data the government is relying on comes from companies hired by and paid for by the mining company. They work for and support the mining company. They are not neutral.

To get accurate data, the federal government must get data for all aspects of this project from neutral sources.

No Barging in the Bering Sea-to-Imuruk Basin Waterway

Annie and I have had many conversations with residents from the Bering Sea to the Imuruk Basin Waterway.

The overwhelming majority want the waterway to be free of barge traffic—meaning no barging in the Bering Sea-to-Imuruk Basin Waterway!

Lack of Sincere Government-to-Government Meetings

The topic of no barging came up at the only in-person government-to-government meeting to date.

The federal government and Graphite One have worked collaboratively for many years. Still, the three tribes whose lifestyles, health, and future food resources will be most impacted have had only one, two-hour, in-person session.

That session occurred this month (October 2026).

We also need to add that this was an in-person meeting in Nome, not in either of the villages. Because of the high cost of travel and rough ocean conditions, Brevig Mission couldn’t send tribal council members to the October meeting.

Luckily, one council member could attend because he was escorting his wife to a medical appointment.

Teller residents could attend because the new normal of late-season winter onset made road travel acceptable. But they too will be forced to spend huge amounts on airfare, lodging, etc., to travel to government-to-government meetings during the winter months, November through April.

Viable Alternative

A viable alternative exists to barging rock equipment, fuel, and construction materials.

During the G2G meeting in Nome, the topic of alternatives was raised. The company has mentioned this alternative in public meetings in both Teller and Brevig Mission.

But they qualify the statement that they will use an alternate route other than the Waterway by saying, “if we can.” But that statement holds nothing because we know they can.

The alternative would be to move all materials by road from Nome.

But the government also uses the word feasible. We directly questioned Gregory Mazer on the term feasible, which, so far, has been interpreted as meaning it’s only feasible if the mining company can make money doing it.

All past indications are that any situation pitting Native health and future food security against making profits will be ruled in favor of the mining company.

What Is Valued?

We know it is “possible” to have all traffic go from Nome, with no traffic going through the BS2IB Waterway.

So, the decision to use the waterway, and to dig a 1,340-foot-deep, waste-filled forever pit, all comes down to what is valued more:

Money for big corporations OR saving and protecting the health and future food security of the sovereign tribes living along the Bering Sea-to-Imuruk Basin Waterway, which lies in one of the most pristine places left on Earth.

The “Temporary Pad” Myth

The mining company calls for a “temporary pad” at water’s edge in Imuruk Basin. The company wants to lay down a thick pad of gravel covering 5 acres. That amounts to nearly four full professional American football fields.

Even if the company removed the gravel, the damage to the area would be permanent. Removing it would further harm the environment.

There is nothing “temporary” about this proposed pad, the proposed mine site, or the proposed access roads.

Permanent scars already exist on the mountainside, in the area already cleared below, and at all the places the company was allowed to drill.

Using this term “temporary” is disingenuous, at best. It is misleading and just not true.

The pad would only be used temporarily. If the company has its way, it would eventually become a permanent, discarded, unused pad.

The mine site and access roads would permanently destroy habitat essential to the food security of local residents.

Cultural archaeological sites have already been affected, and many others will be destroyed if this mine is permitted. They will not be temporarily destroyed. They will be permanently destroyed.

The amount of actual Native-led determination of site locations has been inadequate.

Species Have Been Affected in the Past – If This Mine Is Permitted, Species Will Be Affected in the Future

The company’s “temporary pad” at water’s edge on the Imuruk Basin shoreline would require extensive docking facilities.

Barges traveling through the Waterway would adversely affect an area essential to several species of seals and marine mammals and five species of salmon. The docking facility activity would greatly increase these disturbances.

The area where the company wants to place the “temporary pad” would impede fur-bearing mammal migration, such as moose and reindeer, and would impact critical staging and nesting areas for cranes, swans, geese, and ducks.

ALL other plant and animal species would be impacted.

After the US Coast Guard placed the LORAN station on Point Spencer in 1961, all beluga whale activity in and outside the waterway ceased.

The station was taken down and abandoned in 2010, leaving behind permanent scars and, as noted earlier, pollution.

Then, after a 50-year absence, beluga whales, an important subsistence food resource, returned.

The people of the waterway know the same thing will happen to other vital Inupiaq food-source species if the government allows a permit to dig a 1,340-foot-deep hole in the ground.

They know the noise from “a fleet” of 141-ton haul trucks, plus the vibrations and sound from the company’s repeated seismic blasting in the pit, will further cause the animals to flee the area.

Reclamation: The Most Untrue Word

The biggest lie in this whole process is the term “reclamation.”

According to my computer dictionary, Reclamation is the act or process of returning something to a former, better, or functional state.

This proposed pad, and all other lands disturbed by the proposed project, including the 17–19-mile road, the mine footprint, and the gravel pad and docking facility at the water’s edge in Imuruk Basin, will never be returned to their former state.

The ruined areas can’t be made better than nature made them, and the minute they would have been disturbed, they would cease to exist in their intended, naturally functional state.

Alaska government workers claim they have some magic brew of seeds that will help “reclaim” the land. But none of these seeds are native to this area. They are, in fact, invasive species!

If you’ve ever spent time in Arctic tundra, you know the species that return after a disturbance aren’t the same plants that are there naturally.

The saying “government of the people, by the people, for the people” is being threatened here in Western Alaska.

A private, foreign company that is proposing to dig a 1,340-foot-deep hole in the traditional hunting and fishing grounds of the people of the Bering Sea-to-Imuruk Basin Waterway is subsidized by the federal government.

The state of Alaska is granting them permits without addressing Native people’s concerns. Neither government entity is trying to hide its support, as they show up together with the company to public meetings.

A win-win situation—where the sovereign tribal nation’s health and future food security is valued, preserved, and guaranteed, while at the same time the corporations and governments profit monetarily—does not exist.

No win-win exists for the Inupiaq people if this mine is built.

International sources of graphite exist. There are cheaper alternatives. We’ve been using them for decades.

In Conclusion

We urge you to question and scrutinize all of Graphite One’s proposals to determine whether they can guarantee the future food security of the people of the Bering Sea-to-Imuruk Basin Waterway.

We are confident that if the situation is viewed through that lens, then the only long-term correct choice will be to reject all Graphite One’s permit applications.

Skip to content